Adjustment of cage at concrete weight coating plant in Mukran, Germany
Workers installing pegs on the cage as well as between the cage and the pipe joints. The pegs are needed to hold the cage at an equal distance from the pipe joint during cage installation and concrete coating.
Reference(s) for the image and text, is owned by Nord Stream AG