Castoro Dieci.. Lowering The Pipeline
The pipeline is progressively lowered to its designated place on the seabed. The Castoro Dieci is laying the shortest segment (28 kilometres) of each of the twin pipelines.
Reference(s) for the image and text, is owned by Nord Stream AG